Eleventh Congress
Third Regular Session
REPUBLIC ACT NO. 9136
AN ACT ORDAINING REFORMS IN THE ELECTRIC POWER INDUSTRY, AMENDING FOR THE PURPOSE CERTAIN LAWS AND FOR OTHER PURPOSES
Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled:
CHAPTER I
TITLE AND DECLARATION OF POLICY
Section 1. Short Title
This Act shall be known as the "Electric Power Industry Reform Act of 2001". It shall hereinafter be referred to as the Act.
Section 2. Declaration of Policy
It is hereby declared the policy of the State:
Section 3. Scope
. – This Act shall provide a framework for the restructuring of the electric power industry, including the privatization of the assets of NPC, the transition to the desired competitive structure, and the definition of the responsibilities of the various government agencies and private entities.
Section 4. Definition of Terms
. –
(aaa) “Transmission Charge” refers to the regulated cost or charges for the use of a transmission system which may include the availment of ancillary services;
(bbb) “Transmission Development Plan” or “TDP” refers to the program for managing the transmission system through efficient planning for the expansion, upgrading, rehabilitation, repair and maintenance, to be formulated by DOE and implemented by the TRANSCO pursuant to this Act;
(ccc) “Transmission of Electricity” refers to the conveyance of electricity through the high voltage backbone system; and
(ddd) “Universal Charge” refers to the charge, if any, imposed for the recovery of the stranded cost and other purposed pursuant to Section 34 hereof.
CHAPTER II
ORGANIZATION AND OPERATION OF THE ELECTRIC POWER INDUSTRY
Section 5. Organization
The electric power industry shall be divided into four (4) sectors, namely: generation, transmission, distribution and supply.
Section 6. Generation Sector
Generation of electric power, a business affected with public interest, shall be competitive and open.
Upon the effectivity of this Act, any new generation company shall, before it operates, secure from the Energy Regulatory Commission (ERC) a certificate of compliance pursuant to the standards set forth in this Act, as well as health, safety and environmental clearances from the appropriate government agencies under existing laws.
Any law to the contrary notwithstanding, power generation shall not be considered a public utility operation. For this purpose, any person or entity engaged or which shall engage in power generation and supply of electricity shall not be required to secure a national franchise.
Upon implementation of retail competition and open access, the prices charged by a generation company for the supply of electricity shall not be subject to regulation by the ERC except as otherwise provided in this Act.
Pursuant to the objective of lowering electricity rates to end-users, sales of generated power by generation companies shall be value added tax zero-rated.
The ERC shall, in determining the existence of market power abuse or anti-competitive behavior, require from generation companies the submission of their financial statements.
Section 7
Transmission Sector.- The transmission of electric power shall be regulated common electricity carries business, subject to the ratemaking powers of the ERC.
The ERC shall set the standards of the voltage transmission that shall distinguish the transmission from the subtransmission assets. Pending the issuance of such new standards, the distinction between the transmission and subtransmission assets shall be as follows: 230 kilovolts and above in the Luzon grid, 69 kilovolts and above in the Visayas and in the isolated distribution systems, and 138 kilovolts and above in the Mindanao Grid: Provided, That for the Visayas and the isolated distribution system, should the 69 kilovolt line not form part of the main transmission grid and be directly connected to the substation of the distribution utility, it shall form part of the subtransmission system.
Section 8. Creation of the National Transmission Company
There is hereby created a National Transmission Corporation, hereinafter referred to as TRANSCO, which shall assume the electrical transmission function of the National Power Corporation (NPC), and have the powers and functions hereinafter granted. The TRANSCO shall assume the authority and responsibility of NPC for the planning, construction and centralized operation and maintenance of its high voltage transmission facilities, including grid interconnections and ancillary services.
Within six (6) months from the effectivity of this Act, the transmission and subtransmission facilities of NPC and all other assets related to transmission operations, including the nationwide franchise of NPC for the operation of the transmission system and the grid, shall be transferred to the TRANSCO. The TRANSCO shall be wholly owned by the Power Sector Assets and Liabilities Management Corporation (PSALM Corp.).
The subtransmission functions and assets shall be segregated from the transmission functions, assets and liabilities for transparency and disposal: Provided, That the subtransmission assets shall be operated and maintained by TRANSCO until their disposal to qualified distribution utilities which are in a position to take over the responsibility for operating, maintaining, upgrading, and expanding said assets. All transmission and subtransmission related liabilities of NPC shall be transferred to and assumed by the PSALM Corp.
TRANSCO shall negotiate with and thereafter transfer such functions, assets, and associated liabilities to the qualified distribution utility or utilities connected to such subtransmission facilities not
later than two (2) years from the effectivity of this Act or the start of open access, whichever comes earlier: Provided, That in the case of electric cooperatives, the TRANSCO shall grant concessional financing over a period of twenty (20) years: Provided, however, That the installment payments to TRANSCO for the acquisition of subtransmission facilities shall be given first priority by the electric cooperatives out of the net income derived from such facilities. The TRANSCO shall determine the disposal value of the subtransmission assets based on the revenue potential of such assets.
In case of disagreement in valuation, procedures, ownership participation and other issues, the ERC shall resolve such issues.
The take over by a distribution utility of any subtransmission asset shall not cause a diminution of service and quality to the end-users. Where there are two or more connected distribution utilities, the consortium or juridical entity shall be formed by and composed of all of them and thereafter shall be granted a franchise to operate the subtransmission asset by the ERC.
The subscription rights of each distribution utility involved shall be proportionate to their load requirements unless otherwise agreed by the parties.
Aside from the PSALM Corp., TRANSCO and connected distribution utilities, no third party shall be allowed ownership or management participation, in whole or in part, in such subtransmission entity.
The TRANSCO may exercise the power of eminent domain subject to the requirements of the Constitution and existing laws. Except as provided herein, no person, company or entity other than the TRANSCO shall own any transmission facilities.
Prior to the transfer of the transmission functions by NPC to TRANSCO, and before the promulgation of the Grid Code, ERC shall ensure that NPC shall provide to all electric power industry participants open and non-discriminatory access to its transmission system. Any violation thereof shall be subject to the fines and penalties imposed herein.
Section 9. Functions and Responsibilities
Upon the effectivity of this Act, the TRANSCO shall have the following functions and responsibilities:
In the preparation of the TDP, TRANSCO shall consult the other participants of the electric power industry such as the generation companies, distribution utilities, and the electricity end-users. The TDP shall be submitted to the DOE for integration with the Power Development Program and the Philippine Energy Plan, provided for in Republic Act No. 7638 otherwise known as ‘the Department of Energy Act of 1992”.
A generation company may develop and own or operate dedicated point-to-point limited transmission facilities that are consistent with the TDP: Provided, That such facilities are required only for the purpose of connecting to the transmission system, and are used solely by the generating facility, subject to prior authorization by the ERC: Provided, further, That in the event that such assets are required for competitive purposes, ownership of the same shall be transferred to the TRANSCO at a fair market price: Provided, finally, That in the case of disagreement on the fair market price, the ERC shall determine the fair market value of the asset.
Section 10. Corporate Powers of the TANSCO
As a corporate entity, TRANSCO shall have the following corporate powers:
Section 11. TRANSCO Board of Directors
All the powers of the TRANSCO shall be vested in and exercised by a Board of Directors. The Board shall be composed of a Chairman and six (6) members. The Secretary of the Department of Finance (DOF) shall be the ex officio Chairman of the Board. The other members of the TRANSCO Board shall include the Secretary of the Department of Energy (DOE), the Secretary of the Department of Environment and Natural Resources (DENR), the President of TRANSCO, and three (3) members to be appointed by the President, each representing Luzon, Visayas and Mindanao.
The members of the Board so appointed by the President of the Philippines shall serve for a term of six (6) years, except that any person appointed to fill-in a vacancy shall serve only the unexpired term of
his/her predecessor in office. All members of the Board shall be professionals of recognized competence and expertise in the fields of engineering , finance, economics, law or business management. No member of the Board or any of his relatives within the fourth civil degree of consanguinity or affinity shall have any interest, either as investor, officer or director, in any generation company or distribution utility or other entity engaged in transmitting, generating and supplying electricity specified by ERC.
Section 12. Powers and Duties of the Board
The following are the powers of the Board:
Section 13. Board Meetings
The Board shall meet as often as may be necessary upon the call of the Chairman of the Board or by a majority of the Board members.
Section 14. Board Per Diems and Allowances
The members of the Board shall receive per diem for each regular or special meeting of the board actually attended by them, and, upon approval of the Secretary of the Department of Finance, such other allowances as the Board may prescribe.
Section 15. Quorum
The presence of at least four (4) members of the Board shall constitute a quorum, which shall be necessary for the transaction of any business. The affirmative vote of a majority of the members present in a quorum shall be adequate for the approval of any resolution, decision or order, except when the Board shall otherwise agree that a greater vote is required.
Section 16. Powers of the President of TRANSCO
The President of TRANSCO shall be appointed by the President of the Philippines. In the absence of the Chairman, the President shall preside over board meetings.
The President of TRANSCO shall be the Chief Executive Officer of TRANSCO and shall have the following powers and duties:
Section 17. Exemption from the Salary Standardization Law
The salaries and benefits of employees in the TRANSCO shall be exempt from Republic Act. No. 6758 and shall be fixed by the TRANSCO Board.
Section 18. Profits
The net profit, if any, of TRANSCO shall be remitted to the PSALM Corp. not later than ninety (90) days after the immediately preceding quarter.
Section 19. Transmission Charges
The transmission charges of the TRANSCO shall be filed with and approved by the ERC pursuant to Paragraph (f) of Section 43 hereof.
Section 20. TRANSCO Related Businesses
TRANSCO may engage in any related business which maximizes utilization of its assets: Provided, That a portion of the net income derived from such undertaking utilizing assets which form part of the rate base shall be used to reduce transmission wheeling rates as determined by the ERC. Such portion of net income used to reduce the transmission wheeling rates shall not exceed fifty percent (50%) of the net income derived from such undertaking.
Separate accounts shall be maintained for each business undertaking to ensure that the transmission business shall neither subsidize in any way such business undertaking nor encumber its transmission assets in any way to support such business.
Section 21. TRANSCO Privatization
Within six (6) months from the effectivity of this Act, the PSALM Corp. shall submit a plan for the endorsement by the Joint Power Commission and the approval of the President of the Philippines. The President of the Philippines thereafter shall direct PSALM Corp. to award in open competitive bidding, the transmission facilities, including grid interconnections and ancillary services to a qualified party either through an outright sale or a concession contract. The buyer/concessionaire shall be responsible for the improvement, expansion, operation, and/or maintenance of its transmission assets and the operation of any related business. The award shall result in maximum present value of proceeds to the national government. In case a concession contract is awarded, the concessionaire shall have a contract period of twenty-five (25) years, subject to review and renewal for a maximum period of another twenty-five (25) years.
In any case, the awardee shall comply with the Grid code and the TDP as approved. The sale agreement/concession contract shall include, but not limited to, the provision for performance and financial guarantees or any other covenants which the national government may require. Failure to comply with such obligations shall result in the imposition of appropriate sanctions or penalties by the ERC.
The awardee shall be financially and technically capable, with proven domestic and./or international experience and expertise as a leading transmission system operator. Such experience must be with a transmission system of comparable capacity and coverage as the Philippines.
Section 22. Distribution Sector
The distribution of electricity to end-users shall be a regulated common carrier business requiring a national franchise. Distribution of electric power to all end-users may be undertaken by private distribution utilities, cooperatives, local government units presently undertaking this function and other duly authorized entities, subject to regulation by the ERC.
Section 23. Functions of Distribution Utilities
A distribution utility shall have the obligation to provide distribution services and connections to its system for any end-user within its franchise area consistent with the distribution code. Any entity engaged therein shall provide open and non-discriminatory access to its distribution system to all users.
Any distribution utility shall be entitled to impose and collect distribution wheeling charges and connection fees from such end-users as approved by the ERC.
A distribution utility shall have the obligation to supply electricity in the least cost manner to its captive market, subject to the collection of retail rate duly approved by the ERC.
To achieve economies of scale in utility operations, distribution utilities may, after due notice and public hearing, pursue structural and operational reforms such as but not limited to, joint actions between or among the distribution utilities, subject to the guidelines issued by the ERC. Such joint actions shall result in improved efficiencies, reliability of service, reduction of costs and compliance to the performance standards prescribed in the IRR of this Act.
Distribution utilities shall submit to the ERC a statement of their compliance with the technical specifications prescribed in the Distribution Code and the performance standards prescribed in the IRR of this Act. Distribution utilities which do not comply with any of the prescribed technical specifications and performance standards shall submit to the ERC a plan to comply, within three (3) years, with said prescribed technical specifications and performance standards. The ERC shall, within sixty (60) days upon receipt of such plan, evaluate the same and notify the distribution utility concerned of its action. Failure to submit a feasible and credible plan and/or failure to implement the same shall serve as grounds for the imposition of appropriate sanctions, fines or penalties.
Distribution utilities shall prepare and submit to the DOE their annual distributions developments plans. In the case of electric cooperatives, such plans shall be submitted through the National Electrification Administration.
Distribution utilities shall provide universal service within their franchise, over a reasonable time from the requirement thereof, including unviable areas, as part of their social obligations, in a manner that shall sustain the economic viability of the utility, subject to the approval by the ERC in the case of private or government-owned utilities. To this end, distribution utilities shall submit to the DOE their plans for serving such areas as part of their distribution development plans. Areas which a franchised distribution utility cannot or does not find viable may be transferred to another distribution utility, if any is available, who will provide the service, subject approval by ERC. In cases where franchise holders fail and/or refuse to service any area within their franchise territory and allowed another utility to service the same, then the status quo shall be respected.
Distribution utilities may exercise the power of eminent domain subject to the requirements of the Constitution and existing laws.
Section 24. Distribution Wheeling Charge
The distribution wheeling charges of distribution utilities shall be filed with and approved by the ERC pursuant to Paragraph (f) of Section 43 hereof.
Section 25. Retail Rate
The retail rates charged by distribution utilities for the supply of electricity in their captive market shall be subject to regulation by the ERC based on the principle of full recovery of prudent and reasonable economic costs incurred, or such other principles that will promote efficiency as may be determined by the ERC.
Every distribution utility shall identify and segregate in its bills to end-users the components of the retail rate, as defined in this Act.
Section 26. Distribution Related Businesses
Distribution utilities may, directly or indirectly, engage in any related business undertaking which maximizes the utilization of their assets: Provided, That a portion of the net income derived from such undertaking utilizing assets which form part of the rate base shall be used to reduce its distribution wheeling charges as determined by the ERC. Provided, further, That such portion of net income used to reduce their distribution wheeling charges shall not exceed fifty percent (50%) of the net income derived from such undertaking: Provided, finally, That separate accounts are maintained for each business undertaking to ensure that the distribution business shall neither subsidize in any way such business undertaking nor encumber its distribution assets in any way to support such business.
Section 27. Franchising Power in the Electric Power Sector
The power to grant franchises to persons engaged in the transmission and distribution of electricity shall be vested exclusively in the Congress of the Philippines and all laws inconsistent with this Act particularly, but not limited to, Section 43 of PD 269, otherwise known as the “National Electrification Decree”, are hereby deemed repealed or modified accordingly: Provided, That all existing franchises shall be allowed to their full term: Provided, further, That in the case of electric cooperatives, renewals and cancellations shall remain with the National Electrification Commission under the National Electrification Administration for five (5) more years after the enactment of this Act.
Section 28. De-Monopolization and Shareholding Dispersal
In compliance with the constitutional mandate for dispersal of ownership and de-monopolization of public utilities, the holdings of persons, natural or juridical, including directors, officers, stockholders and related interests, in a distribution utility and their respective holding companies shall not exceed twenty-five (25%) percent of the voting shares of stock unless the utility or the company holding the shares or its controlling stockholders are already listed in the Philippine Stock Exchange (PSE): Provided, That controlling stockholders of small distribution utilities are hereby required to list in the PSE within five (5) years from the enactment of this Act if they already own the stocks. New controlling stockholders shall undertake such listing within five (5) years from the time they acquire ownership and control. A small distribution company is one whose peak demand is equal to or less than Ten megawatts (10MW).
The ERC shall, within sixty (60) days from the effectivity of this Act, promulgate the rules and regulations to implement and effect this provision.
This Section shall not apply to electric cooperatives.
Section 29. Supply Sector
The supply sector is a business affected with public interest. Except for distribution utilities and electric cooperatives with respect to their existing franchise areas, all suppliers of electricity to the contestable market shall require a license from the ERC.
For this purpose, the ERC shall promulgate rules and regulations prescribing the qualifications of electricity suppliers which shall include, among other requirements, a demonstration of their technical capability, financial capability, and creditworthiness: Provided, That the ERC shall have authority to require electricity suppliers to furnish a bond or other evidence of the ability of a supplier to withstand market disturbances or other events that may increase the cost of providing service.
Any law to the contrary notwithstanding , supply of electricity to the contestable market shall not be considered a public utility operation. For this purpose, any person or entity which shall engage in the supply of electricity to the contestable market shall not be required to secure a national franchise.
The prices to be charged by suppliers for the supply of electricity to the contestable market shall not be subject to regulation by the ERC.
Electricity suppliers shall be subject to the rules and regulations concerning abuse of market power, cartelization, and other anti-competitive or discriminatory behavior to be promulgated by the ERC.
In its billings to end-users, every supplier shall identify and segregate the components of its suppliers charge, as defined herein.
Section 30. Wholesale Electricity Spot Market
Within one (1) year from the effectivity of this Act, the DOE shall establish a wholesale electricity spot market composed of the wholesale electricity spot market participants. The market shall provide the mechanism for identifying and setting the price of actual variations from the quantities transacted under contracts between sellers and purchasers of electricity.
Jointly with the electric power industry participants, the DOE shall formulate the detailed rules for the wholesale electricity spot market. Said rules shall provide the mechanism for determining the price of electricity not covered by bilateral contracts between sellers and purchasers of electricity users. The price determination methodology contained in said rules shall be subject to the approval of ERC. Said rules shall also reflect accepted economic principles and provide a level playing field to all electric power industry participants. The rules shall provide, among others, procedures for:
The wholesale electricity spot market shall be implemented by a market operator in accordance with the wholesale electricity spot market rules. The market operator shall be an autonomous group, to be constituted by DOE, with equitable representation from electric power industry participants, initially under the administrative supervision of the TRANSCO. The market operator shall undertake the preparatory work and initial operation of the wholesale electricity spot market. Not later than one (1) year after the implementation of the wholesale electricity spot market, an independent entity shall be formed and the functions, assets and liabilities of the market operator shall be transferred to such entity with the joint endorsement of the DOE and the electric power industry participants. Thereafter, the administrative supervision of the TRANSCO over such entity shall cease.
Subject to the compliance with the membership criteria, all generating companies, distribution utilities, suppliers, bulk consumers/end-users and other similar entities authorized by the ERC shall be eligible to become members of the wholesale electricity spot market.
The ERC may authorize other similar entities to become eligible as members, either directly or indirectly, of the wholesale electricity spot market. All generating companies, distribution utilities, suppliers, bulk consumers/end-users and other similar entities authorized by the ERC, whether direct or indirect members of the wholesale electricity spot market, shall be bound by the wholesale electricity spot market, shall be bound by the wholesale electricity spot market rules with respect to transactions in that market.
NEA may, in exchange for adequate security and a guarantee fee, act as a guarantor for purchases of electricity in the wholesale electricity spot market by any electric cooperative or small distribution utility to support their credit standing consistent with the provisions hereof. For this purpose, the authorized capital stock of NEA is hereby increased to Fifteen billion pesos (P15,000,000,000.00)
All electric cooperatives which have outstanding uncollected billings to any local government unit shall report such billings to NEA which shall, in turn, report the same to the Department of Budget and Management (DBM) for collection pursuant to Executive Order 190 issued on December 21, 1999.
The cost of administering and operating the wholesale electricity spot market shall be recovered by the market operator through a charge imposed to all market members: Provided, That such charge shall be filed with and approved by the ERC.
In cases of national and international security emergencies or natural calamities, the ERC is hereby empowered to suspend the operation of the wholesale electricity spot market or declare a temporary wholesale electricity spot market failure.
Section 31. Retail Competition and Open Access
Any law to the contrary notwithstanding, retail competition and open access on distribution wires shall be implemented not later than three (3) years upon the effectivity of this Act, subject to the following conditions:
Upon the initial implementation of open access, the ERC shall allow all electricity end-users with a monthly average peak demand of at least one megawatt (1MW) for the preceding twelve (12) months to be the contestable market. Two (2) years thereafter, the threshold level for the contestable market shall be reduced to seven hundred fifty kilowatts (750kW). At this level, aggregators shall be allowed to supply electricity to end-users whose aggregate demand within a contiguous area is at least seven hundred fifty kilowatts (750kW). Subsequently and every year thereafter, the ERC shall evaluate the performance of the market. On the basis of such evaluation, it shall gradually reduce threshold level until it reaches the household demand level. In the case of electric cooperatives, retail competition and open access shall be implemented not earlier than five (5) years upon the effectivity of this Act.
Section 32. NPC Stranded Debt and Contract Cost Recovery
Stranded debt of NPC shall refer to any unpaid financial obligations of NPC.
Stranded contract costs of NPC shall refer to the excess of the contracted cost of electricity under eligible IPP contracts of NPC over the actual selling price of the contracted energy output of such contracts in the market. Such contracts shall have been approved by the ERB as of December 31, 2000.
The national government shall directly assume a portion of the financial obligations of NPC in an amount not to exceed Two hundred billion pesos (P200,000,000,000,00)
The ERC shall verify the reasonable amounts and determine the manner and duration for the full recovery of stranded debt and stranded contract costs as defined herein: Provided, That the duration for such recovery shall not be shorter than fifteen (15) years nor longer than twenty-five (25) years. The ERC shall, at the end of the first year of the implementation of stranded cost recovery and every year thereafter, conducts a review to determine whether there is under-recovery or over-recovery and adjust (tune-up) the level of stranded cost recovery charge accordingly. Any amount to be included for stranded cost recovery shall be reflected as a separate item in the consumer billing statement.
Section 33. Distribution Utilities Stranded Contract Costs Recovery
Stranded contract costs of distribution utilities shall refer to the excess of the contracted cost of electricity under eligible contracts of such utilities over the actual selling price of such contracts in the market. Such contracts shall have been approved by the ERB as of December 31, 2000.
A distribution utility shall recover stranded contract costs: Provided, however, That such costs of the IPPs of distribution utilities are subject to review by ERC in order to determine fairness and reasonableness in relation to the average price of land-based IPP projects entered into by NPC at the time they were contracted. The ERC shall take into consideration all factors that affect the total cost of NPC IPP generation projects, including direct or indirect subsidies or incentives provided by the Government.
Within one (1) year from the start of open access, any distribution utility that seeks recovery of stranded contract costs shall file with the ERC notice of such intent together with an estimate of such obligations, including the present value thereof and such other supporting data as may be required by the ERC. Any distribution utility that does not file within the date specified shall not be eligible for such recovery.
Any distribution utility which seeks to recover stranded cost shall have a duty to mitigate its potential stranded contract costs by making reasonable best efforts to:
Other mitigating measures which are reasonably known and generally accepted within the electric power industry shall be utilized. The ERC shall not require the distribution utility to take a loss to reduce stranded contract costs or divest assets, unless the divestiture is imposed as a penalty as provided herein.
The relevant distribution utility shall submit to the ERC quarterly reports showing the amount of stranded costs recovered and the balance remaining to be recovered.
Within three (3) months from the submission of the application for stranded cost recovery by the relevant distribution utilities, the ERC shall verify the reasonable amounts and determine the manner and duration for the full recovery of stranded contract costs as defined herein: Provided, That the duration for such recovery shall not be shorter than fifteen (15) years nor longer than twenty-five (25) years. Any amount to be included for stranded cost recovery shall be reflected as a separate item in the consumer billing statement.
The ERC shall, at the end of the first year of the implementation of stranded cost recovery and every year thereafter, conduct a review to determine whether there is under-recovery or over recovery and adjust (true-up) the level of stranded cost recovery charge accordingly. In case of an over-recovery, the ERC shall ensure that any excess amount shall be remitted to the Special Trust Fund created under Section 34 hereof. A separate account shall be created for these amounts which shall be held in trust for any future claims of distribution utilities for stranded cost recovery. At the end of the stranded cost recovery period, any remaining amount in this account shall be used to reduce the electricity rates to the end-users.
Section 34. Universal Charge
Within one (1) year from the effectivity of this Act, a universal charge to be determined, fixed and approved by the ERC., shall be imposed on all electricity end-users for the following purposes:
The universal charge shall be non-bypassable charge which shall be passed on and collected from all end-users on a monthly basis by the distribution utilities. Collections by the distribution utilities and the TRANSCO in any given month shall be remitted to the PSALM Corp. on or before the fifteenth (15th) of the succeeding month, net of any amount due to the distribution utility. Any end-user or self-generating entity not connected to a distribution utility shall remit its corresponding universal charge directly to the TRANSCO.
The PSALM Corp., as administrator of the fund, shall create a Special Trust Fund which shall be disbursed only for the purposes specified herein in an open and transparent manner. All amounts collected for the universal charge shall be distributed to the respective beneficiaries within a reasonable period to be provided by the ERC.
Section 35. Royalties, Returns and Tax Rates for Indigenous Energy Resources
The provisions of Section 79 of Commonwealth Act No. 137 (C.A. No. 137) and any law to the contrary notwithstanding, the President of the Philippines shall reduce the royalties, returns and taxes collected for the exploitation of all indigenous sources of energy, including but not limited to, natural gas and geothermal steam, so as to effect parity of tax treatment with the existing rates for imported coal, crude oil, bunker fuel and other imported fuels.
To ensure lower rates for end-users, the ERC shall forthwith reduce the rates of power from all indigenous sources of energy.
Section 36. Unbundling of Rates and Functions
Within six (6) months from the effectivity of this Act, NPC shall file with the ERC its revised rates. The rates of NPC shall be unbundled between transmission and generation rates and the rates shall reflect the respective costs of providing each service. Inter-grid and intra-grid cross subsidies for both the transmission and the generation rates shall be removed in accordance with this Act.
Within six (6) months from the effectivity of this Act, each distribution utility shall file its revised rates for the approval by the ERC. The distribution wheeling charge shall be unbundled from the retail rate and the rates shall reflect the respective costs of providing each service. For both the distribution retail wheeling and suppliers charges, inter-class subsidies shall be removed in accordance with this Act.
Within six (6) months from the date of submission of revised rates by NPC and each distribution utility, the ERC shall notify the entities of their approval.
Any electric power industry participant shall functionally and structurally unbundle its business activities and rates in accordance with the sectors as identified in Section 5 hereof. The ERC shall ensure full compliance with this provision.
CHAPTER III
ROLE OF THE DEPARTMENT OF ENERGY
Section 37. Powers and Functions of the DOE
In addition to its existing powers and functions, the DOE is hereby mandated to supervise the restructuring of the electricity industry. In pursuance thereof, Section 5 of RA 7638 otherwise known as “The Department of Energy Act of 1992” is hereby amended to read as follows:
CHAPTER IV
REGULATION OF THE ELECTRIC POWER INDUSTRY
Section 38. Creation of the Energy Regulatory Commission
There is hereby created an independent, quasi-judicial regulatory body to be named the Energy Regulatory Commissions (ERC). For this purpose, the existing Energy Regulatory Board (ERB) created under Executive Order No. 172, as amended, is hereby abolished.
The Commission shall be composed of a Chairman and four (4) members to be appointed by the President of the Philippines. The Chairman and the members of the Commission shall be natural-born citizens and residents of the Philippines, persons of good moral character, at least thirty-five (35) years of age, and of recognized competence in any of the following fields: energy, law, economics, finance, commerce, or engineering, with at least three (3) years actual and distinguished experience in their
respective fields of expertise: Provided, That out of the four (4) members of the Commission, at least one (1) shall be a member of the Philippine Bar with at least ten (10) years experience in the active practice of law, and one (1) shall be a certified public accountant with at least ten (10) years experience in active practice.
Within three (3) months from the creation of the ERC, the Chairman shall submit for the approval by the President of the Philippines the new organizational structure and plantilla positions necessary to carry out the powers and functions of the ERC.
The Chairman of the Commission, who shall be a member of the Philippine Bar, shall act as the Chief Executive Officer of the Commission.
All members of the Commission shall have a term of seven (7) years: Provided, That for the first appointees, the Chairman shall hold office for seven (7) years, two (2) members shall hold office for five (5) years and the other two (2) members shall hold office for three (3) years; Provided, further, That appointment to any future vacancy shall only be for the unexpired term of the predecessor: Provided, finally, That there shall be no reappointment and in no case shall any member serve for more than seven (7) years in the Commission.
The Chairman and members of the Commission shall assume office of the beginning of their terms: Provided, That, if upon the effectivity of this Act, the Commission has not been constituted and the new staffing pattern and plantilla positions have not been approved and filled-up, the current Board and existing personnel of ERB shall continue to hold office.
The existing personnel of the ERB, if qualified, shall be given preference in the filling up of plantilla positions created in the ERC, subject to existing civil service rules and regulations.
Members of the Commission shall enjoy security of tenure and shall not be suspended or removed from office except for just cause as specified by law.
The Chairman and members of the Commission or any of their relatives within the fourth civil degree of consanguinity or affinity, legitimate or common law, shall be prohibited from holding any interest whatsoever, either as investor, stockholder, officer or director, in any company or entity engaged in the business of transmitting, generating, supplying or distributing any form of energy and must, therefore, divest through sale or legal disposition of any and all interests in the energy sector upon assumption of office.
The presence of at least three (3) members of the Commission shall constitute a quorum and the majority vote of two (2) members in a meeting where a quorum is present shall be necessary for the adoption of any rule, ruling, order, resolution, decision, or other act of the Commission in the exercise of its quasi-judicial functions: Provided, That in fixing rates and tariffs, an affirmative vote of three (3) members shall be required.
Section 39. Compensation and Other Emoluments for ERC Personnel
The compensation and other emoluments for the Chairman and members of the Commission and the ERC personnel shall be exempted from the coverage of Republic Act No. 6758, otherwise known as the “Salary Standardization Act”. For this purpose, the schedule of compensation of the ERC personnel, except for the initial salaries and compensation of the Chairman and members of the Commission, shall be submitted for approval by the President of the Philippines. The new schedule of compensation shall be implemented within six (6) months from the effectivity of this Act and may be upgraded by the President of the Philippines as the need arises: Provided, That in no case shall the rate be upgraded more than once a year.
The Chairman and members of the Commission shall initially be entitled to the same salaries, allowances and benefits as those of the Presiding Justice and Associate Justices of the Supreme Court, respectively. The Chairman and the members of the Commission shall, upon completion of their term or
upon becoming eligible for retirement under existing laws, be entitled to the same retirement benefits and the privileges provided for the Presiding Justice and Associate Justices of the Supreme Court, respectively.
Section 40. Enhancement of Technical Competence
The ERC shall establish rigorous training programs for its staff for the purpose of enhancing the technical competence of the ERC in the following areas: evaluation of technical performance and monitoring of compliance with service and performance standards, performance-based rate-setting reform, environmental standards and such other areas as will enable the ERC to adequately perform its duties and functions.
Section 41. Promotion of Consumer Interests
The ERC shall handle consumer complaints and ensure the adequate promotion of consumer interests.
Section 42. Budget of the ERC
The amount of One hundred fifty million pesos (P150,000,000.00) is hereby allocated from the existing budget of the ERB for the initial operation of the ERC. Any balance shall initially be sourced from the Office of the President of the Philippines. Thereafter, the annual budget of the ERC shall be included in the regular or special appropriations.
Section 43. Functions of the ERC
The ERC shall promote competition, encourage market development, ensure customer choice and penalize abuse of market power in the restructured electricity industry. In appropriate cases, the ERC is authorized to issue cease and desist order after due notice and hearing. Towards this end, it shall be responsible for the following key functions in the restuctured industry:
In case the rate setting methodology used is RORB, it shall be subject to the following guidelines:
All notices of hearings to be conducted by the ERC for the purpose of fixing rates or fees shall be published at least twice for two successive weeks in two (2) newspapers of nationwide circulation.
Section 44. Transfer of Powers and Functions
The powers and functions of the Energy Regulatory Board not inconsistent with the provisions of this Act are hereby transferred to the ERC. The foregoing transfer of powers and functions shall include all applicable funds and appropriations, records, equipment, property and personnel as may be necessary.
Section 45. Cross Ownership, Market Power Abuse and Anti-Competitive Behavior
No participant in the electricity industry or any other person may engage in any anti-competitive behavior including, but not limited to, cross-subsidization, price or market manipulation, or other unfair trade practices detrimental to the encouragement and protection of contestable markets.
No generation company, distribution utility, or its respective subsidiary or affiliate or stockholder or official of a generation company or distribution utility, or other entity engaged in generating and supplying electricity specified by ERC within the fourth civil degree of consanguinity or affinity, shall be allowed to hold any interest, directly or indirectly, in TRANSCO or its concessionaire. Likewise, the TRANSCO, or its concessionaire or any of its stockholders or officials or any of their relatives within the fourth civil degree of consanguinity or affinity, shall not hold any interest, whether directly or indirectly, in any generation company or distribution utility. Except for ex officio government-appointed representatives, no person who is an officer or director of the TRANSCO or its concessionaire shall be an officer or director of any generation company, distribution utility or supplier.
An “affiliate” means any person which, alone or together with any other person, directly or indirectly, through one or more intermediaries, controls, is controlled by, or is under common control with another person. As used herein, “control” shall mean the power to direct or cause the direction of the management policies of a person by contract, agency or otherwise.
To promote true market competition and prevent harmful monopoly and market power abuse, the ERC shall enforce the following safeguards:
For purposes of this Section, the grid basis shall consist of three (3) separate grids, namely Luzon, Visayas and Mindanao. The ERC shall have the authority to modify or amend this definition of a grid when two or more of the three separate grids become sufficiently interconnected to constitute a single grid or as conditions may otherwise permit.
Exceptions from these limitations shall be allowed for isolated grids that are not connected to the high voltage transmission system. Except as otherwise provided for in this Section, any restriction on ownership and/or control between or within sectors of the electricity industry may be imposed by ERC only insofar as the enforcement of the provisions of this Section is concerned.
The ERC shall, within one (1) year from the effectivity of this Act., promulgate rules and regulations to ensure and promote competition, encourage market development and customer choice and discourage/penalize abuse of market power, cartelization and any anti-competitive or discriminatory behavior, in order to further the intent of this Act and protect the public interest. Such rules and regulations shall define the following:
The ERC shall, motu proprio, monitor and penalize any market power abuse or anti-competitive or discriminatory act or behavior by any participant in the electric power industry. Upon finding that a market participant has engaged in such act or behavior, the ERC shall stop and redress the same. Such remedies shall, without limitation, include the imposition of price controls, issuance of injunctions, requirement of divestment or disgorgement of excess profits and imposition of fines and penalties pursuant to this Act.
The ERC shall, within one (1) year from the effectivity of this Act, promulgate rules and regulations providing for a complaint procedure that, without limitation, provides the accused party with notice and an opportunity to be heard.
Section 46. Fines and Penalties
The fines and penalties that shall be imposed by the ERC for any violation of or non-compliance with this Act or the IRR shall range from a minimum of fifty thousand pesos (P50,000.00) to a maximum of Fifty million pesos (P50,000,000.00).
Any person who is found guilty of any of the prohibited acts pursuant to Section 45 hereof shall suffer the penalty of prision mayor and fine ranging from Ten thousand pesos (P10,000.00) to Ten million pesos (P10,000,000.00), or both, at the discretion of the court.
The members of the Board of Directors of the juridical companies participating in or covered in the generation companies, the distribution utilities, the TRANSCO or its concessionaire or supplier who violate the provisions of this Act may be fined by an amount not exceeding double the amount of damages caused by the offender or by imprisonment of one (1) year or two (2) years or both at the discretion of the court. This rule shall apply to the members of the Board who knowingly or by neglect allows the commission or omission under the law.
If the offender is a government official or employee, he shall, in addition, be dismissed from the government service with prejudice to reinstatement and with perpetual or temporary disqualification from holding any elective or appointive office.
If the offender is an alien, he may, in addition to the penalties prescribed, be deported without further proceedings after service of sentence.
Any case which involves question of fact shall be appealable to the Court of Appeals and those which involve question of law shall be directly appealable to the Supreme Court.
The administrative sanction that may be imposed by the ERC shall be without prejudice to the filing of a criminal action, if warranted.
To ensure compliance with this Act, the penalty of prision correccional or a fine ranging from Five thousand pesos (P5,000.00) to Five million pesos (P5,000,000.00), or both, at the discretion of the court, shall be imposed on any person, including but not limited to the president, member of the Board, Chief Executive Officer or Chief Operating Officer of the corporation, partnership, or any other entity involved, found guilty of violating or refusing to comply with any provision of this Act or its IRR, other than those provided herein.
Any party to an administrative proceeding may, at any time, make an offer to the ERC, conditionally or otherwise, for a consented decree, voluntary compliance or desistance and other settlement of the case. The offer and any or all of the ultimate facts upon which the offer is based shall be considered for settlement purposes only and shall not be used as evidence against any party for any other purpose and shall not constitute an admission by the party making the offer of any violation of the laws, rules, regulations, orders and resolutions of the ERC, nor as a waiver to file any warranted criminal actions.
In addition, Congress may, upon recommendation of the DOE and/or ERC, revoke such franchise or privilege granted to the party who violated the provisions of this Act.
CHAPTER V
PRIVATIZATION OF THE ASSETS OF THE NATIONAL POWER CORPORATION
Section 47. NPC Privatization
Except for the assets of SPUG, the generation assets, real estate, and other disposable assets as well as IPP contracts of NPC shall be privatized in accordance with this Act. Within six (6) months from the effectivity of this Act, the PSALM Corp shall submit a plan for the endorsement by the Joint Congressional Power Commission and the approval of the President of the Philippines, on the total privatization of the generation assets, real estate, other disposable assets as well as existing IPP contracts of NPC and thereafter, implement the same, in accordance with the following guidelines, except as provided for in Paragraph (f) herein:
In the case of foreign investors, at least seventy-five percent (75%) of the funds used to acquire NPC-generation assets and IPP contracts shall be inwardly remitted and registered with the Bangko Sentral ng Pilipinas.
Section 48. National Power Board of Directors
Upon the passage of this Act, Section 6 of R.A. 6395, as amended, and Section 13 of RA 7638, as amended, referring to the composition of the National Power Board of Directors, are hereby repealed and a new Board shall be immediately organized. The new Board shall be composed of the Secretary of Finance as Chairman, with the following as members: the Secretary of Energy, the Secretary of Budget and Management, the Secretary of Agriculture, the Director-General of the National Economic and Development Authority, the Secretary of Environment and Natural Resources, the Secretary of Interior and Local Government, the Secretary of the Department of Trade and Industry, and the President of the National Power Corporation.
CHAPTER VI
POWER SECTOR ASSETS AND LIABILITIES MANAGEMENT
Section 49. Creation of Power Sector Assets and Liabilities Management Corporation
There is hereby created a government-owned and -controlled corporation to be known as the “Power Sector Assets and Liabilities Management Corporation”, hereinafter referred to as the “PSALM Corp.”, which shall take ownership of all existing NPC generation assets, liabilities, IPP contracts, real estate and all other disposable assets. All outstanding obligations of the NPC arising from loans, issuances of bonds, securities and other instruments of indebtedness shall be transferred to and assumed by the PSALM Corp. within one hundred eighty (180) days from the approval of this Act.
Section 50. Purpose and Objective, Domicile and Term of Existence
The principal purpose of the PSALM Corp. is to manage the orderly sale, disposition, and privatization of NPC generation assets, real estate and other disposable assets, and IPP contracts with the objective of liquidating all NPC financial obligations and stranded contract costs in an optimal manner.
The PSALM Corp. shall have its principal office and place of business within Metro Manila.
The PSALM Corp. shall exist for a period of twenty five (25) years from the effectivity of this Act, unless otherwise provided by law, and all assets held by it, all moneys and properties belonging to it, and all its liabilities outstanding upon the expiration of its term of existence shall revert to and be assumed by the National Government.
Section 51. Powers
The Corporation shall, in the performance of its functions and for the attainment of its objective, have the following powers:
Section 52. Power Sector Assets and Liabilities Management Corporation, Meetings, Quorum and Voting
The Corporation shall be administered, and its powers and functions exercised, by a Board of Directors which shall be composed of the Secretary of Finance as the Chairman, the Secretary of Budget and Management, the Secretary of the Department of Energy, the Director-General of the National Economic and Development Authority, the Secretary of the Department of Justice, the Secretary of the Department of Trade and Industry and the President of the PSALM Corp. as ex officio members thereof.
The Board of Directors shall meet regularly and as frequently as may be necessary to enable it to discharge its functions and responsibilities. The presence at a meeting of four (4) members shall constitute a quorum, and the decision of the majority of three (3) members present at a meeting where there is quorum shall be the decision of the Board of Directors.
Section 53. Powers of the President of PSALM Corp
The President of PSALM Corp. shall be appointed by the President of the Philippines. In the absence of the Chairman, the President shall preside over Board meetings.
The PSALM Corp. President shall be the Chief Executive Officer of PSALM Corp. and shall have the following powers and duties:
Section 54
.Exemption from the Salary Standardization Law. – The salaries and benefits of employees in the PSALM Corp. shall be exempt from Republic Act No. 6758 and shall be fixed by the PSALM Corp. Board.
Section 55. Property of the PSALM Corp
The following funds, assets, contributions and other property shall constitute the property of the PSALM Corp.:
Section 56. Claims Against the PSALM Corp
The following shall constitute the claims against the PSALM Corp.:
CHAPTER VII
PROMOTION OF RURAL ELECTRIFICATION
Section 57. Conversion of Electric Cooperatives
Electric cooperatives are hereby given the option to convert into either stock cooperative under the Cooperatives Development Act or stock corporation under the Corporation Code. Nothing contained in this Act shall deprive electric cooperatives of any privilege or right granted to them under Presidential Decree No. 269, as amended, and other existing laws.
Section 58. Additional Mandate of the National Electrification Administration (NEA)
NEA shall develop and implement programs:
NEA shall continue to be under the supervision of the DOE and shall exercise its functions under Presidential Decree No. 269, as amended by Presidential Decree No. 1645 insofar as they are consistent with this Act.
Section 59. Alternative Electric Service for Isolated Villages
The provision of electric service in remote and unviable villages that the franchised utility is unable to service for any reason shall be opened to other qualified third parties.
Section 60. Debts of Electric Cooperatives
Upon the effectivity of this Act, all outstanding financial obligations of electric cooperatives to NEA and other government agencies incurred for the purpose of financing the rural electrification program shall be assumed by the PSALM Corp. in accordance with the program approved by the President of the Philippines within one (1) year from the effectivity of this Act which shall be implemented and completed within three (3) years from the effectivity of this Act. The ERC shall ensure a reduction in the rates of electric cooperatives commensurate with the resulting savings due to the removal of the amortization payments of their loans. Within five (5) years from the condonation of debt, any electric cooperative which shall transfer ownership or control of its assets, franchise or operations thereof shall repay PSALM Corp. the total debts including accrued interests thereon.
CHAPTER VIII
GENERAL PROVISIONS
Section 61. Reportorial Requirements
The DOE shall take the necessary measures to ensure that the provisions of this Act are properly implemented, and shall submit to the Power Commission a semiannual report on the implementation of this Act, on or before the last week of April and October of each year.
Section 62. Joint Congressional Power Commission
Upon the effectivity of this Act, a congressional commission, hereinafter referred to as the “Power Commission”, is hereby constituted. The Power Commission shall be composed of fourteen (14) members with the chairmen of the Committee on Energy of the Senate and the House of Representatives and six (6) additional members from each House, to be designated by the Senate President and the Speaker of the House of Representatives, respectively. The minority shall be entitled to pro rata representation but shall have at least one (1) representative in the Power Commission.
The Commission shall, in aid of legislation, perform the following functions, among others:
In furtherance hereof, the Power Commission is hereby empowered to require the DOE, ERC, NEA, TRANSCO, generation companies, distribution utilities, suppliers and other electric power industry participants to submit reports and all pertinent data and information relating to the performance of their respective functions in the industry. Any person who willfully and deliberately refuses without just cause to extend the support and assistance required by the Power Commission to effectively attain its objectives shall, upon conviction, be punished by imprisonment of not less than one (1) year but not more than six (6) years or a fine of not less than Fifty thousand pesos (P50,000.00) but not more than Five hundred thousand pesos (P500,000.00) or both at the discretion of the court.
The Power Commission shall adopt its internal rules of procedures; conduct hearings and receive testimonies, reports and technical advice; invite or summon by subpoena ad testificandum any public official, private citizen or any other person to testify before it, or require any person by subpoena duces tecum to produce before it such records, reports, documents or other materials as it may require; and generally require all the powers necessary to attain the purposes for which it is created. The Power Commission shall be assisted by a secretariat to be composed of personnel who may be seconded from the Senate and the House of Representatives and may retain consultants. The secretariat shall be headed by an executive director who has sufficient background and competence on the policies and issues relating to electricity industry reforms as provided in this Act. To carry out its powers and functions, the initial sum of twenty- five million pesos (P25,000,000.00) shall be charged against the current appropriations of the Senate. Thereafter, such amount necessary for its continued operation shall be included in the annual General Appropriations Act.
The Power Commission shall exist for period of ten (10) years from the effectivity of this Act and may be extended by a joint concurrent resolution.
Section 63. Separation Benefits of Officials and Employees of Affected Agencies
National government employees displaced or separated from the service as a result of the restructuring of the electricity industry and privatization of NPC assets pursuant to this Act, shall be entitled to either a separation pay and other benefits in accordance with existing laws, rules or regulations or be entitled to avail of the privileges provided under a separation plan which shall be one and one-half month salary for every year of service in the government: Provided, however, That those who avail of such privilege shall start their government service anew if absorbed by any government-owned successor company. In no case shall there be any diminution of benefits under the separation plan until the full implementation of the restructuring and privatization.
Displaced or separated personnel as a result of the privatization, if qualified, shall be given preference in the hiring of the manpower requirements of the privatized companies.
The salaries of employees of NPC shall continue to be exempt from the coverage of Republic Act No. 6758, otherwise known as “The Salary Standardization Act”.
With respect to employees who are not retained by NPC, the government, through the Department of Labor and Employment, shall endeavor to implement re-training, job counseling, and job placement programs.
Section 64. Fiscal Prudence
To promote the prudent management of government resources, the creation of new positions and the levels of or increase in salaries and all other emoluments and benefits of TRANSCO and PSALM Corp. personnel shall be subject to the approval of the President of the Philippines. The compensation and all other emoluments and benefits of the officials and members of the
Board of the TRANSCO and PSALM Corp. shall be subject to the approval of the President of the Philippines.
Section 65. Environmental Protection
Participants in the generation, distribution and transmission sub-sectors of the industry shall comply with all environmental laws, rules, regulations and standards promulgated by the Department of Environment and Natural Resources including, in appropriate cases, the establishment of an environmental guarantee fund.
Section 66. Benefits to Host Communities
The obligations of generation companies and energy resource developers to communities hosting energy generating facilities and/or energy resource developers as defined under Chapter II, Sections 289 to 294 of the Local Government Code and Section 5(i) of Republic Act No. 7638 and their implementing rules and regulations and applicable orders and circulars consistent with this Act shall continue: Provided, That the obligations mandated under Chapter II, Section 291 of Republic Act No. 7160, shall apply to privately-owned corporations or entities utilizing the national wealth of the locality.
To ensure the effective implementation of the reduction in cost of electricity in the communities where the source of energy is located, the mechanics and procedures prescribed in the Department of the Interior and Local Government (DILG)-DOE Circulars No. 95-01 and 98-01 dated October 31, 1995 and September 30, 1998, respectively and other issuances related thereto shall be pursued.
Towards this end, the fund generated from the eighty percent (80%) of the national wealth tax shall, in no case, be used by any local government unit for any purpose other than those for which it was intended.
In case of any violation or noncompliance by any local government official of any provision thereof, the DILG shall, upon prior notice and hearing, order the project operator, through the DOE, to withhold the remittance of the royalty payment to the host community concerned pending completion of the investigation. The unremitted funds shall be deposited in a government bank under a trust fund.
Section 67. NPC Offer of Transition Supply Contracts
Within six (6) months from the effectivity of this Act, NPC shall file with the ERC for its approval a transition supply contract duly negotiated with the distribution utilities containing the terms and conditions of supply and a corresponding schedule of rates, consistent with the provisions hereof, including adjustments and/or indexation formulas which shall apply to the term of such contracts. The term of the transition supply contracts shall not extend beyond one (1) year from the introduction of open access. Such contracts shall be based on the projected demand of such utilities less any of their currently committed quantities under eligible IPP contracts as defined in Section 33 hereof: Provided, That the total generation capacity of such signed transition supply contracts shall not exceed the level of NPC owned, controlled or committed capacity as of the effectivity of this Act. Such transition supply contracts shall be assignable to the NPC successor generating companies.
Within six (6) months from the date of submission of the transition supply contract by NPC, the ERC shall notify NPC of their approval of the rates contained therein.
The ERC shall maintain a record of the contract terms and rates offered by NPC. Likewise, the ERC shall update monthly, the rates using the appropriate adjustment and/or indexation formula.
Notwithstanding the provisions of Section 25 hereof, the rates charged by a distribution utility for the generation component of the supply of electricity in their distribution retail supply rate shall, for the term of the transition supply contracts, not exceed the transition supply contract rates, as updated monthly. The recovery of costs incurred by a distribution utility for any generation component in excess of the transition supply contract rates shall be disallowed by the ERC, except for eligible contracts as defined under Section 33 hereof: Provided, That such limitation on the recovery of generation component costs by a distribution utility shall apply only to the equivalent quality and quantity of electricity still available to the distribution utility from NPC.
Section 68
Review of IPP Contracts – An inter-agency committee chaired by the Secretary of Finance, with the Secretary of the Department of Justice and the Director General of the National Economic Development Authority as members thereof is hereby created upon the effectivity of this Act. The Committee shall immediately undertake a thorough review of all IPP contracts. In cases where such contracts are found to have provisions which are grossly disadvantageous, or onerous to the Government, the Committee shall cause the appropriate government agency to file an action under the arbitration clauses provided in said contracts or initiate any appropriate action under Philippine laws. The PSALM Corporation shall diligently seek to reduce stranded costs, if any.
Section 69
Renegotiation of Power Purchase and Energy Conversion Agreements between Government Entities. – Within three (3) months from the effectivity of this Act, all power purchase and energy conversion agreements between the PNOC-Energy Development Corporation (PNOC-EDC) and NPC, including but not limited to the Palimpinon, Tongonan and Mt. Apo Geothermal complexes, shall be reviewed by the ERC and the terms thereof amended to remove any hidden costs or extraordinary mark-ups in the cost of power or steam above their true costs. All amended contracts shall be submitted to the Joint Congressional Power Commission for approval. The ERC shall ensure that all savings realized from the reduction of said mark-ups shall be passed on to all end-users.
Section 70. Missionary Electrification
Notwithstanding the divestment and/or privatization of NPC assets, IPP contracts and spun-off corporations, NPC shall remain as a National Government-owned and -controlled corporation to perform the missionary electrification function through the Small Power Utilities Group (SPUG) and shall be responsible for providing power generation and its associated power delivery systems in areas that are not connected to the transmission system. The missionary electrification function shall be funded from the revenues from sales in missionary areas and from the universal charge to be collected from all electricity end-users as determined by the ERC.
Section 71
Electric Power Crisis Provision – Upon the determination by the President of the Philippines of an imminent shortage of the supply of electricity, Congress may authorize, through a joint resolution, the establishment of additional generating capacity under such terms and conditions as it may approve.
Section 72. Mandated Rate Reduction
Upon the effectivity of this Act, residential end-users shall be granted a rate reduction from NPC rates of thirty centavos per kilowatt-hour (P0.30/kWh). Such reduction shall be reflected as a separate item in the consumer billing statement.
Section 73. Lifeline Rate
A socialized pricing mechanism called a lifeline rate for the marginalized end-users shall be set by the ERC, which shall be exempted from the cross subsidy phase-out under this Act for a period often (10) years, unless extended by law. The level of consumption and the rate shall be determined by the ERC after due notice and hearing.
Section 74. Cross Subsidies
Cross subsidies within a grid between grids and / or classes of customers shall be phased out in a period not exceeding three (3) years from the establishment by the ERC of a universal charge which shall be collected form all electricity end-users. Such level of cross subsidies shall be made transparent and identified separately in the billing statements provided to end-users by the suppliers.
The ERC may extend the period for the removal of cross subsidies for a maximum period of one (1) year upon finding that cessation of such mechanism would have a material adverse effect upon the public interest, particularly the residential end-user; or would have an immediate, irreparable, and adverse financial effect on distribution utility.
CHAPTER IX
FINAL PROVISIONS
Section 75. Statutory Construction
This Act shall, unless the context indicates otherwise, be construed in favor of the establishment, promotion, preservation of competition and people empowerment so that the widest participation of the people, whether directly or indirectly, is ensured. With respect to NPCs debts and IPP and related contracts, nothing in this Act shall be construed as:
Section 76. Education and Protection of End Users
End-users shall be educated about the implementation of retail access and its impact on end-users and on the proper use of electric power. Such education shall include, but not limited to, the existence of competitive electricity suppliers, choice of competitive electricity services, regulated transmission and distribution services, systems reliability, aggregation, market, itemized billing, stranded cost, uniform disclosure requirements, low-income bill payment, energy conservation and safety measures.
The DOE, in coordination with the NPC, NEA, ERC and the Office of Press Secretary-Philippine Information Agency (OPS-PIA), shall undertake an information campaign to educate the public on the restructuring of the electric power industry and privatization of NPC.
Section 77. Implementing Rules and Regulations
The DOE shall, in consultation with relevant government agencies, the electric power industry participants, non-government organization and end-users, promulgate the Implementing Rules and Regulation (IRR) of the Act within six (6) months from the effectivity of this Act, subject to the approval by the Power Commission.
Section 78. Injunction and Restraining Order
The implementation of the provisions of the Act shall not be restrained or enjoined except by an order issued by the Supreme Court of the Philippines.
Section 79. Separability Clause
If for any reason, any provision of this act is declared unconstitutional or invalid, the other parts or provisions hereof which are not affected thereby shall continue to be in full force and effect.
Section 80. Applicability and Repealing Clause
The applicability provisions of Commonwealth Act No. 146, as amended, otherwise known as the “Public Service Act”; Republic Act 6395, as amended, revising the charter of NPC; Presidential Decree 269, as amended, referred to as the National Electrification Decree; Republic Act 7638, otherwise known as the “Department of Energy Act of 1992”; Executive Order 172, as amended, creating the ERB; Republic Act 7832 otherwise known as the “Anti-Electricity and Electric Transmission Lines / Materials Pilferage Act of 1994”, shall continue to have full force and effect except insofar as they are inconsistent with this Act.
The provision with respect to electric power of Section 11(c) of Republic Act 7916, as amended, and Section 5(f) of Republic Act 7227, are hereby repealed or modified accordingly.
Presidential Decree No. 40 and all laws, decrees, rules and regulations, or portion thereof, inconsistent with this Act are hereby repealed or modified accordingly.
Section 81. Effectivity Clause
This Act shall take effect on the fifteenth day following its publication in at least two (2) national paper of general circulation.
Approved,
| (Sgd.) AQUILINO Q. PIMENTEL JR. President of the Senate | (Sgd.) FELICIANO BELMONTE JR. Speaker of the House of Representatives | |
This Act which is a consolidation of House Bill No. 8457 and Senate Bills No. 1712, 1621, 1943 and 2000 was finally passed by the House of Representatives and the Senate on May 31, 2001 and June 4, 2001, respectively.
LUTGARDO B. BARBO Secretary of the Senate
ROBERTO P. NAZARENO Secretary General House of Representatives
Approved: JUN 08 2001
GLORIA MACAPAGAL – ARROYO
President of the Philippines
For information and research only, and not legal advice. This text may not reflect later amendments. For certified copies, refer to the Official Gazette or the issuing agency.