Nineteenth Congress Third Regular Session
[ REPUBLIC ACT NO. 12120, January 08, 2025 ]
AN ACT PROMOTING THE DEVELOPMENT OF THE PHILIPPINE NATURAL GAS INDUSTRY, CONSOLIDATING FOR THE PURPOSE ALL LAWS RELATING TO THE TRANSMISSION, DISTRIBUTION, AND SUPPLY OF NATURAL GAS, AND APPROPRIATING FUNDS THEREFOR
Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled:
TITLE AND DECLARATION OF POLICY
Section 1. Title
This Act shall be known as the "Philippine Natural Gas Industry Development Act".
Section 2. Declaration of Policy
It is hereby declared the policy of the State to:
Section 3. Scope
This Act shall provide a framework for the development of the PDNGI, and its transition from an emerging industry into mature industry within a competitive natural gas market. It shall also define the responsibilities of various government agencies and private entities in furtherance of this national goal.
It shall apply to the permitting of siting, construction, operation and maintenance, expansion, modification, rehabilitation, decommissioning, and abandonment of PDNGI Facilities for Own-Use or Third-Party Access (TPA). It shall likewise apply to the accreditation of Participants in the trade of natural gas, including but not limited to the purchase, supply, aggregation, bunkering, reselling, and export of natural gas, and any other activities related to the PDNGI.
All activities of the Department of Energy (DOE), Energy Regulatory Commission (ERC), and other concerned government agencies relevant to the development and regulation of the PDNGI shall be in accordance with this Act.
Section 4. Definition of Terms
For the purpose of this Act, the following terms shall be defined as follows:
Section 5. Powers and Responsibilities of the Department of Energy
In addition to its existing powers and functions, the DOE shall have the overall responsibility of supervising and monitoring the PDNGI and developing the strategies to implement the State policies declared under this Act. Toward this end, the DOE shall exercise the following powers and functions:
The DOE shall also coordinate with relevant government agencies to align natural gas development, national climate targets, and ensure a smooth transition to a sustainable energy system.
Section 6. Powers and Responsibilities of the Energy Regulatory Commission
The powers of the ERC shall be in accordance with the provisions of Republic Act No. 9136 on the organization, operation, regulation of the power industry, and such other powers as may be given to it under applicable laws.
It shall create offices and appoint personnel necessary to efficiently and effectively perform its functions in regulating power generated from natural gas, subject to existing laws, rules, and regulations.
Section 7. Powers and Responsibilities of the Department of Environment and Natural Resources
In addition to its functions under Executive Order No. 192, otherwise known as the "Reorganization Act of the Department of Environment and Natural Resources", the DENR, together with the DOE and the PCG, shall determine and monitor compliance with the environmental standards for the siting, construction, operation and maintenance, expansion, rehabilitation, decommissioning and abandonment of PDNGI Facilities, pursuant to existing environmental laws, such as Republic Act No. 8749, otherwise known as the "Philippine Clean Air Act of 1999", as amended, Republic Act No. 7586, otherwise known as the "National Integrated Protected Areas System Act of 1992", as amended, Republic Act No. 11038, otherwise known as the "Expanded National Integrated Protected Areas System Act of 2018", Republic Act No. 6657, otherwise known as the "Comprehensive Agrarian Reform Law of 1988", as amended, and other existing environmental laws, rules, and regulations: Provided, That, within six (6) months from the effectivity of this Act, the DENR shall establish national standards for methane emissions and other pollutants from natural gas industries not otherwise regulated by existing laws.
Section 8. Powers and Responsibilities of the Philippine Coast Guard
In addition to its functions under Republic Act No. 9993, otherwise known as the "Philippine Coast Guard Law of 2009", the PCG, together with the DENR, shall determine and monitor compliance with the marine environmental protection standards for the offshore and waterfront siting, construction, operation and maintenance, expansion, modification, rehabilitation, decommissioning, and abandonment of PDNGI Facilities.
Section 9
Powers and Responsibilities of the Department of Transportation (DOTr) through the Maritime Industry Authority. - In addition to its functions under Presidential Decree No. 474, otherwise known as the "Maritime Industry Decree of 1974", the MARINA shall have general jurisdiction over the development, promotion, and regulation of all enterprises engaged in the business of designing, constructing, manufacturing, acquiring, operating, supplying, repairing, and maintaining vessels, or parts thereof, including LNG carriers. The MARINA shall also provide for the effective supervision, regulation, and rationalization of the organizational management, ownership, and operations of all water transport utilities and other maritime enterprises.
Section 10. Powers and Responsibilities of the DOTr and its Attached Agencies
In addition to its functions under Executive Order No. 125, series of 1987, otherwise known as the "Reorganization Act of the Ministry of Transportation and Communications", as amended, and other applicable laws, the DOTr or its attached agencies, such as the Land Transportation Office, Land Transportation Franchising and Regulatory Board, and MARINA, in coordination with the DOE, DENR, DOH, DTI-BPS, and other relevant government agencies, shall issue the appropriate guidelines and regulations, and the applicable permits, licenses, certificates, or authorizations for virtual pipelines, motor vehicles, and marine vessels transporting, storing, or processing natural gas in its original state or liquefied form, as well as marine facilities used to import, receive, load, unload, transport, process, and store natural gas in its original or liquefied form, including those utilized as offshore LNG terminals, The DOTr shall monitor and ensure compliance therewith.
Section 11
Powers and Responsibilities of the Department of Trade and Industry-Bureau of Philippine Standards. - In addition to its functions under Republic Act No. 4109, tiled, "An Act to Convert the Division of Standards under the Bureau of Commerce into a Bureau of Standards, to Provide for the Standardization and/or Inspection of Products and Imports of the Philippines and for Other Purposes", the DTI-BPS, together with the DOE, shall determine, develop, formulate, promulgate, and revise the PNS for natural gas and PDNGI Facilities.
Section 12. Powers and Responsibilities of the Department of Science and Technology (DOST)
In addition to its functions under Executive Order No. 128, otherwise known as the "Reorganization Act of the National Science and Technology Authority", the DOST shall undertake scientific and technological research and development for the improvement of new technologies in the PDNGI.
Section 13. Powers and Responsibilities of the Department of Health
In addition to its functions under Executive Order No. 317, series of 1941, titled "Organizing the Department of Health and Public Welfare", as amended, and Republic Act No. 11223, otherwise known as the "Universal Health Care Act", the DOH, together with the DOE, ERC, or DOTr, shall:
Section 14. Referral to the Philippine Competition Commission
Consistent with its functions under Republic Act No. 10667, the PCC shall:
Section 15. Powers and Responsibilities of the National Commission on Indigenous Peoples (NCIP)
In addition to its functions under Republic Act No. 8371, otherwise known as "The Indigenous Peoples' Rights Act of 1997", the NCIP, upon the DOE's endorsement in accordance with the PEP or its certification that the PDNGI project is an energy project of national significance, shall process the application for the certification under Section 59, Chapter VIII of Republic Act No. 8371, in accordance with the processes provided in Republic Act No. 11234.
Section 16. Powers and Responsibilities of the Philippine Energy Research and Policy Institute (PERPI)
Pursuant to Republic Act No. 11572, otherwise known as the "Philippine Energy Research and Policy Institute Act", the PERPI shall conduct research and development on renewable gas technologies, including production, storage, and distribution, with support from the DOST and Philippine National Oil Company (PNOC).
CHAPTER III ORGANIZATION, OPERATION, AND REGULATION OF THE DOWNSTREAM NATURAL GAS INDUSTRY
Section 17. Aggregation
The DOE shall be the lead agency to determine the need for and regulate the development of aggregation in the country. The DOE shall determine and designate the aggregator/s and issue the applicable policies to implement aggregation, adhering to the principles of economies of scale, as well as energy transparency, competitive pricing, security and reliability, and consumer welfare. The DOE may direct any of its attached agencies and instrumentalities to participate in aggregation activities.
Section 18. DOE Permits and Issuances
The DOE shall have the power and responsibility to evaluate, approve, and issue the permits necessary for the siting, construction, operation and maintenance, expansion, modification, rehabilitation, decommissioning, and abandonment of any PDNGI Facility or activity.
The DOE shall accredit Participants and acknowledge notifications of natural gas importation and exportation. Permits issued to Permit Holders may vary based on their intended use, such as Own-Use Permit or TPA Permit.
Section 19. Compliance with Philippine Laws, Rules, and Regulations
Permit Holders and Participants shall comply with all Philippine laws, rules, and regulations implemented by the relevant government agencies.
Section 20. Compliance with Standards
The DOE shall ensure that Permit Holders and Participants, products, facilities, services, and systems comply with the standards set by relevant government agencies in terms of quality, design, efficiency, safety, structural integrity, and operation and maintenance. Regulations shall be consistent with applicable Philippine and internationally accepted natural gas industry standards.
Section 21. Confidential Information
The DOE, ERC, or PCC, as applicable, shall determine whether submitted documents and reports are confidential or proprietary information. The Government shall not disclose confidential or proprietary information to the public, other Permit Holders, or Participants unless allowed by the Permit Holder or Participant, or when required by laws, rules, and regulations.
Section 22. Authority to Obtain Information
The DOE, ERC, PCC, and other concerned government agencies may, through a valid order, require any Permit Holder or Participant, to provide, within a reasonable specified period, all information and documents relating to all matters such as the permit, rates, and operation of the business and PDNGI Facilities, with explanations on the information or documents submitted, subject to Section 21 of this Act. The failure of a Permit Holder or Participant to provide the required information or documents without valid reason shall be punishable under this Act.
Section 23. Natural Gas Supply
The procurement, delivery and pricing of natural gas from indigenous production facilities or from importation to the PDNGI shall be transparent and secure. If necessary, the DOE, ERC, and PCC shall require the suppliers to submit relevant information pertaining to supply contracting, procurement, pricing, and distribution scheme to users for monitoring purposes.
Procurement and utilization of indigenous natural gas, including without limitation, by gas-fired power plants, shall be prioritized over imported natural gas: Provided, That it is consistent with the State's policy of ensuring energy security and consumer welfare. An indigenous natural gas supplier and aggregator shall provide fair and open access to its natural gas supply in non-discriminatory and transparent manner through physical supply, administrative or financial contracts, or any other arrangements allowed by the DOE.
Power produced from indigenous natural gas shall have priority over other conventional energy sources. Such prioritization shall cover indigenous natural gas power supply contracting, including mechanisms for minimum supply requirements.
The DOE shall establish mechanisms for the optimal and full utilization of indigenous natural gas in the generation, transmission, distribution, and supply of power, subject to standards and limitations consistent with the state's policy of ensuring energy security and consumer welfare. Pursuant thereto, the DOE shall formulate mechanisms that shall prescribe a mandated minimum percentage of the electricity demand of generation companies and/or distribution utilities to be sourced from indigenous natural gas. Such minimum percentage shall be reviewed and adjusted by the DOE as may be necessary.
Subject to viability, the PDNGI Facilities may be designed and constructed to ensure the accommodation of both indigenous natural gas and/or imported natural gas, pursuant to the standards determined by the DOE. The DOE shall establish measures to support the supply and use of indigenous natural gas in the domestic downstream natural gas sector.
Section 24. Decommissioning and Abandonment of Downstream Natural Gas Facility
No Permit Holder shall abandon or decommission any portion of a PDNGI Facility without prior written authorization from the DOE and absent its approval of an abandonment and decommissioning plan based on Philippine or internationally accepted standards. The DOE, in coordination with the DENR, shall provide the guidelines and regulations for the decommissioning and abandonment of PDNGI Facilities.
Section 25. Administrative Rules and Procedures
The DOE shall issue the administrative rules and procedures for the discharge of administrative cases and imposition of administrative fines and penalties. The Rules of Court shall apply in a suppletory manner.
Section 26. Fees
All concerned government agencies shall have the authority to prescribe and collect fees and charges relating to the issuance or review of permits, and the supervision and regulation of the PDNGI.
CHAPTER IV OPERATION OF DOWNSTREAM NATURAL GAS FACILITIES
Section 27. PDNG Transmission and Distribution System and Related Facilities
The DOE shall issue a license or authorization to Permit Holders of PDNG transmission and distribution systems for the purpose of ensuring safe, efficient, and reliable infrastructure and facilities.
Section 28. Cross-Ownership
An entity may hold an interest in the ownership of upstream and downstream natural gas facilities, as well as the supply and aggregation of natural gas to gas buyers subject to legal prohibitions on anti-competitive acts. Such ownership shall be allowed for operational and financial feasibility considerations, subject to the powers and responsibilities of the PCC under Section 14 of this Act. The PCC shall review compliance with Republic Act No. 10667, specifically to prevent substantial lessening of competition, while the DOE shall review the impact on energy security, the cost of electricity, market-stability, and any other matters concerning the PEP.
The DOE shall apply relevant laws and regulations to ensure that public interest is protected.
Section 29. Own-Use
The Own-Use Permit Holder shall utilize its entire capacity exclusively for its own use and shall not be allowed to enter into TPA arrangements, unless approved by the DOE. The DOE's approval shall specify the standards and limitations thereof.
The DOE may allow the use of a third party, if necessary, to address any issue on the availability of LNG supply which may arise.
The DOE shall provide the rules and limitations on the participation of Own-Use Permit Holders in TPA arrangements, taking into account energy security and consumer welfare.
Section 30. Third-Party Access
A TPA Permit Holder shall utilize its entire capacity exclusively for TPA and shall not be allowed to utilize any such capacity for Own-Use, unless approved by the DOE. The DOE's approval shall specify the standards and limitations thereof.
The DOE may allow a TPA Permit Holder to utilize its capacity for Own-Use, if necessary, to address any issue on the availability of LNG supply which may arise.
The DOE shall provide the rules and limitations on the utilization of TPA Permit Holders' capacity for Own-Use, taking into account energy security and consumer welfare.
The TPA Permit Holder shall submit a regular report on the total capacity, along with all relevant details, to the DOE for monitoring.
Section 31. Third-Party Access Principles
Adherence to the principles of transparency, non-discrimination, and safe practices is the key to the beneficial participation of third-party users. In line with this, the following guiding principles shall be observed:
Section 32. Congestion Management
Whenever a TPA Permit Holder is no longer able to use or has not released the capacity without justifiable reason, the DOE shall have the authority to direct its release.
CHAPTER V STANDARDS ON PRODUCT QUALITY, FACILITY AND SAFETY PRACTICE
Section 33. Standards on Downstream Natural Gas Facilities
All PDNGI Facilities shall be required to provide high quality and efficient service, observe stringent safety systems, accord attention to design details and structural integrity, and employ best practices in operation and maintenance. Regulations shall be consistent with both applicable Philippine and internationally accepted natural gas industry standards. The DOE shall ensure compliance with these requirements.
Applications for DOE permits and for the continued operation of the PDNGI Facilities shall be subject to continuous compliance with these standards.
Section 34. Standards on Product Quality
The Permit Holder and Participant shall maintain the quality of natural gas supply to gas buyers in accordance with Philippine and internationally accepted standards, and ensure that the delivery of natural gas complies with the purification requirements to guarantee the elimination of associated compounds which are unnecessary or damaging to the PDNGI Facilities. The DOE shall ensure compliance with this requirement.
Section 35. Standards on Safety Practice
The Permit Holder and Participant shall implement an acceptable health, safety, security, and environmental management system in accordance with applicable Philippine and internationally accepted standards. The DOE, DENR, DOH, DOLE, and other concerned agencies shall ensure compliance with this requirement.
Section 36. Safety Standards
The DOE, in collaboration with the NREB and PNOC, shall develop and implement safety standards of natural gas, including renewable gases, in order to address their unique properties and risks.
CHAPTER VI RESPONSIBILITIES OF PERMIT HOLDERS AND PARTICIPANTS
Section 37. Responsibilities of Permit Holders
A Permit Holder shall have the following responsibilities:
Section 38. Fiscal Incentives
In recognition of the substantial investments needed for the development, construction, lease, operation and/or maintenance of, and conversion to natural gas facilities, all PDNGI Facilities, as certified by the DOE, shall undergo an evaluation process for possible inclusion in and entitlement to incentives under the Strategic Investment Priority Plan (SIPP), subject to the incentives provided under Title XIII (Tax Incentives) of the National Internal Revenue Code of 1997 (NIRC), as amended by Republic Act No. 11534, otherwise known as the "Corporate Recovery and Tax Incentives for Enterprises Act", and any amendments thereto.
The purchase and sale of indigenous natural gas, aggregated gas, and power generated by generation facilities using indigenous natural gas and aggregated gas shall be exempt from Value-Added Tax (VAT): Provided, That the exemption from VAT for aggregated gas is only to the extent of the amount of indigenous natural gas attributed to be in the aggregated gas. This includes the:
CHAPTER VIII PROMOTION OF COMPETITION
Section 39. Anti-Competitive Behavior
In accordance with Republic Act No. 10667, no Permit Holder or Participant, or any affiliate thereof, may engage in any anti-competitive behavior or abuse its dominant position.
Section 40. Fair Access to Capital and Off-Taker Market
The DOE shall issue applicable policies that promote the financial viability of the PDNGI and ensure competitive access to both capital and off-taker markets for natural gas.
CHAPTER IX FINES AND PENALTIES
Section 41. Administrative Fines and Penalties
The following administrative fines and penalties shall be imposed on any Permit Holder or Participant who violates the provisions of this Act:
Section 42. Criminal Fines and Penalties
Appropriate fines and penalties under existing penal laws shall apply to any criminal violation committed in the implementation of this Act.
CHAPTER X TRANSITORY PROVISIONS
Section 43. Existing Schemes
PDNGI Facilities that have been constructed prior to the effectivity of this Act shall continue to be operated under their existing permits and shall comply with additional requirements as applicable.
The application and implementation of the pertinent provisions of this Act shall not impair vested rights or obligations of contracts. Current and subsisting agreements shall remain valid and in force in accordance with the existing terms and conditions agreed to by the parties until the expiration or termination thereof.
All Permit Holder Holders and Participants shall comply with the provisions of this Act within two (2) years from the effectivity of the IRR of this Act: Provided, That health, safety, security, environmental, construction, operation, and other permits, licenses, certificates, and authorizations issued prior to the effectivity of this Act that are not inconsistent herewith shall remain valid.
PDNG Transmission Systems and PDNG Distribution Systems existing at the time of the effectivity of this Act shall be allowed to continue pursuant to the terms and conditions indicated in their franchise and until the lapse of the period accorded therein.
Section 44. Pending Application
All applications for any activity in the PDNGI which are pending before the DOE upon the effectivity hereof shall be covered by this Act.
CHAPTER XI FINAL PROVISIONS
Section 45. Assignment or Transfer of Permit
Assignment or transfer of the permit or change of operatorship shall be allowed only upon prior written approval by the DOE based on acceptable reasons and compliance by the existing Permit Holder, the assumption by the assignee of all obligations of the existing Permit Holder, and upon meeting the minimum legal, technical, and financial qualifications by the assignee: Provided, That this also applies to sales of shares that would result in a change in control of the Permit Holder or its ultimate parent: Provided, further, That assignments or transfer shall not be allowed near the end of life of a PDNGI Facility if the assignee or transferee cannot comply with the guidelines and regulations for the decommissioning and abandonment of PDNGI Facilities as provided in Section 24 of this Act and if the Environmental Guarantee Fund is not maintained and administered in accordance with the policies and guidelines of the DENR.
Section 46. Amicable Settlement
All parties shall make their best efforts to amicably settle any dispute arising from the performance or interpretation of any provision of this Act.
Section 47. Congressional Oversight
The Joint Congressional Energy Commission (JCEC) shall exercise oversight powers over the implementation of this Act. It shall conduct a policy review five (5) years from the effectivity of this Act, without prejudice to an earlier periodic review as necessary.
The DOE, ERC, and other relevant government agencies shall submit to the JCEC, no later than the fifteenth (15th) day of September each year, annual reports which shall include the latest relevant data, implementation reviews and reports, and policy and regulatory issues.
Section 48. Appropriations
The amount necessary for the implementation of this Act shall be included in the annual General Appropriations Act.
Section 49. Implementing Rules and Regulations
The DOE shall promulgate the rules and regulations for the effective implementation of this Act within six (6) months after its effectivity.
Section 50. Separability Clause
If, for any reason, any provision of this Act is declared unconstitutional or invalid, the other parts or provisions hereof, which are not affected thereby, shall continue to be in full force and effect.
Section 51. Repealing Clause
Any law, presidential decree or issuance, executive order, letter of instruction, rule, or regulation inconsistent with the provisions of this Act is hereby repealed or modified accordingly.
Section 52. Saving Clause
The provision of Presidential Decree No. 87, otherwise known as "The Oil Exploration and Development Act of 1972"; Republic Act No. 9136, otherwise known as the "Electric Power Industry Reform Act of 2001"; and Republic Act No. 9513, otherwise known as the "Renewable Energy Act of 2008", shall remain applicable and shall not in any way be amended or repealed by the provisions of this Act and its rules and regulations.
Section 53. Effectivity
This Act shall take effect after fifteen (15) days following the completion of its publication in the Official Gazette or in a newspaper of general circulation.
Approved,
| (Sgd.) FERDINAND MARTIN G. ROMUALDEZ Speaker of the House of Representatives | (Sgd.) FRANCIS "CHIZ" G. ESCUDERO President of the Senate |
This Act was passed by the Senate of the Philippines as Senate Bill No. 2783 on November 11, 2024 and adopted by the House of Representatives as an amendment to House Bill No. 8456 on November 13, 2024.
REGINALD S. VELASCO
Secretary General House of Representatives
RENATO N. BANTUG, JR.
Secretary of the Senate
Approved: JAN 08 2025
FERDINAND ROMUALDEZ MARCOS JR.
President of the Philippines
For information and research only, and not legal advice. This text may not reflect later amendments. For certified copies, refer to the Official Gazette or the issuing agency.