Seventeenth Congress Third Regular Session Begun and held in Metro Manila, on Monday, the twenty-third day of July, two thousand eighteen.
[ REPUBLIC ACT NO. 11361, August 08, 2019 ]
AN ACT ENSURING THE CONTINUOUS AND UNINTERRUPTED TRANSMISSION AND DISTRIBUTION OF ELECTRICITY AND THE PROTECTION OF THE INTEGRITY AND RELIABILITY OF POWER LINES, AND PROVIDING PENALTIES FOR VIOLATIONS THEREOF
Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled:
Section 1. Short Title
This Act shall be referred to as the "Anti-Obstruction of Power Lines Act."
Section 2. Declaration of Policy
It is hereby declared the policy of the State to ensure uninterrupted conveyance of electricity from generating plants to end users, and protect the integrity and reliability of the country's transmission, sub-transmission, and distribution systems by keeping the land beneath, the air spaces surrounding and the are traversed by power lines clear of dangerous obstructions.
The State further recognizes that the continuous conveyance of electricity is a matter of national security and is essential to sustaining the country's economic development. Finally, the State acknowledge the crucial role of property owners in ensuring that power lines remain free of any dangerous and hazardous activities and improvements.
Section 3. Coverage
This Act shall cover all power lines and other related facilities for the conveyance of electricity throughout the country.
Section 4. Definition of Terms
For purposes of this Act, the following terms shall be defined as stated below:
Section 5. Power Line Corridor
The land beneath, the air spaces surrounding, and the areas traversed by power lines including its horizontal, vertical, and similar clearance requirements shall constitute the power line corridor, which shall at all times be kept clear and free from any power line obstructions, dangerous structures, hazardous activities and improvements, and other similar circumstances in accordance with the provisions of this Act.
The horizontal, vertical and other similar clearance requirements that constitute the power line corridor shall be determined by the Board of Electrical Engineering and approved by the Department of Energy (DOE), and shall be in accordance with the current Philippine Electrical Code.
In case where the power line corridor is wholly or partially located within a private property not owned by the owner or operator of the power lines, it shall constitute a legal easement upon the private property in accordance with the relevant provisions under Book II, Title VII, Chapter 2 of the Civil Code, except if the owner or operator of the power lines shall acquire, lease or enter into other gratuitous or onerous arrangement with the property owner. In the case of legal easement, the owner of the private property shall be compensated the proper easement fee pursuant to the provisions of the Civil Code and other relevant laws, rules and regulations.
Section 6. Prohibited Acts
It is hereby declared unlawful for any person, whether natural or juridical, public or private, to:
Section 7
Prevention and Removal of Power Line Obstruction on Public Property or on Property Owned by Owner or Operator of Power Lines. - In cases where the power line corridor is wholly or partially located within public property or on property owned by the owner or operator of the power lines, the owner or operator of power lines shall have the right to enter the said property to prevent and remove any power line obstruction, and in particular, perform the following acts:
Section 8. Prevention and Removal of Power Line Obstruction on Private Property
The owner or operator of power lines shall have the primary duty and responsibility to remove power line obstructions. In cases where the power line corridor is wholly or partially located within a private property, the property owner shall coordinate and assist the owner or operator of the power lines by facilitating the necessary access in order to perform the acts enumerated in Section 7.
The property owner shall have the primary duty and responsibility to prevent power line obstructions and to inform the owner or operator of the power line of their existence. In the performance of these acts, the property owner shall be entitled to necessary assistance such as, but not limited to, education, and information, and technical and manpower support from the owner or operator of power lines.
In the event that the property owner fails to perform any duty and responsibility under the preceding paragraphs, the owner or operator of the power lines shall have the right to access the power line corridor in order to undertake the acts enumerated under Section 7: Provided, That the entry to private property may only be effected after due notice to, and proper coordination with the property owner: Provided, however, That the foregoing shall no longer be required to avert an imminent danger posed by a power line obstruction in accordance with Article 432 of the Civil Code.
Section 9
Assistance from Local Government Units, Philippine National Police, and Armed Forces of the Philippines. - In the performance of this acts under Sections 7 and 8, the owner or operator of the power lines may seek the assistance of LGU officials, the Philippine National Police (PNP), or the Armed Forces of the Philippines (AFP): Provided, That the LGU officials, the PNP, or the AFP shall render such assistance, as may be deemed necessary.
Section 10. Information, Education, and Communication
The owner or operator of the power lines shall have the duty and responsibility to inform, educate, and communicate to individuals and communities in the areas ir serves the danger of existing power line obstructions, the urgency of removing them, the manner of preventing them, and other important related information.
Section 11. Resettlement
Persons residing in hazardous improvements shall be relocated in accordance with Republic Act No. 7279, otherwise known as the "Urban Development and Housing Act of 1992," as amended.
Section 12
Gathering, Collecting, Removing,and Transporting of Timber, Forest Products, and Coconut Lumber. - Gathering, collecting, removing, and transporting of timber, forest products, and coconut lumber as a result of acts performed under Sections 7 and 8 shall not be considered illegal acts: Provided, That due notice is given to the DENR, and the PCA in the case of coconut lumber, and other relevant government agencies.
Section 13. Right of Eminent Domain
Subject to the limitations and procedures prescribed by the law, the power to exercise the right to eminent domain granted to any person with a franchise to operate, manage, or maintain the electric power lines shall be governed by the pertinent provisions of the Rules of Court.
Section 14. Permits
Building officials of LGUs shall require the building owner who will be undertaking construction or maintenance activities surrounding, adjacent, or proximate to the power line corridor to give due notice to, and coordinate with the concerned owner or operator of the power lines prior to the issuance of a building permit.
Section 15. Penalties
Without prejudice to civil and administrative liability, the following penalties shall be imposed upon any person, both natural and juridical, found guilty of committing any of the prohibited acts specified in Section 6 of this Act.
If the offenses are committed by or in conspiracy with an officer or employee of the owner or operator of the power line, such officer or employees shall suffer a penalty one (1) degree higher than the penalty provided herein.
The local building official who issued a building permit n violation of Section 14 of this Act shall be meted a penalty one (1) degree higher than the penalty provided herein and shall forthwith suffer the penalty of dismissal.
Section 16. Congressional Oversight
The Joint Congressional Energy Commission shall exercise oversight powers over implementation of this Act.
Section 17. Implementing Rules and Regulations
The DOE shall, in consultation with the National Electrification Administration, National Power Corporation, Board of Electrical Engineering. National Transmission Corporation, DPWH, National Housing Authority, HLURB, Housing and Urban Development Coordinating Council, DENR, PCA, National Commission on the Indigenous Peoples, PNP, AFP, electric power industry stakeholders, and private stakeholders, issue the implementing rules and regulations of this Act within one hundred twenty (120) days upon the effectivity of this Act.
Section 18. Separability Clause
Any portion or provision of this Act, which may be declared unconstitutional or invalid shall not have the effect of nullifying other portions or provisions hereof.
Section 19. Repealing Clause
The relevant provisions of Presidential Decree No. 705, as amended, otherwise known as the Revised Forestry Code of the Philippines, Republic Act No. 8048, as amended, otherwise known as the "Coconut Preservation Act of 1995," and the "Urban Development and Housing Act of 1992" are hereby amended. All other laws, ordinances, rules, regulations, and other issuance or parts thereof, which are inconsistent with this Act, are hereby amended, modified, or repealed accordingly.
Section 20. Effectivity
This Act shall take effect fifteen (15) days after its publication in at least two (2) newspapers of general circulation.
Approved,
| (SGD.) GLORIA MACAPAGAL-ARROYO Speaker of the House of Representatives | (SGD.) VICENTE C. SOTTO III President of the Senate |
This Act which is a consolidation of Senate Bill No. 2098 and House Bill No. 6276 was passed by the Senate of the Philippines and the House of Representatives on May 28, 2019 and May 29, 2019, respectively.
DANTE ROBERTO P. MALING
Acting Secretary General House of Representatives
MYRA MARIE D. VILLARICA
Secretary of the Senate
Approved: AUG 08 2019
RODRIGO ROA DUTERTE
President of the Philippines
For information and research only, and not legal advice. This text may not reflect later amendments. For certified copies, refer to the Official Gazette or the issuing agency.